flatin.pt Find an apartment

Alterations in Bonfim, Porto (case NUP/63402/2025/CMP)

Data on building permits issued by the municipalities. Issuing a permit does not guarantee the works go ahead.

Data updated on

Plot on the map
Case number
NUP/63402/2025/CMP
Status
Permit issued

Permit (alvará) issued: building may start. What the stages mean

Operation
Obras de Alteração/Ampliação

Alteration: changes to an existing building — structure, number of homes, layout, exterior finish — without making it bigger. Extension: an existing building gets bigger — in floor area, footprint, façade height or volume. What the types of works mean

decision
29.06.2026
floors
4
m² of construction
134
Developer
Not identified yet

Developments nearby

You may copy and reuse this data as long as you credit the source with a link to flatin.pt. Better still, link to this page: that way the reader can check the number. Terms of use

Talk to a professional

The consultation is given by a licensed agency, not by us. Leave your contact details and they will call to agree a time.

Where

Municipality: Porto

Specify the municipality (optional)

One is enough: phone or email.

Optional.