New construction in Pedroso, Vila Nova de Gaia · Architecture approved
What is already licensed or under licensing here. We don't yet know exactly what each project will be — we show what the municipal source says.
Data updated on
Data on building permits issued by the municipalities. Issuing a permit does not guarantee the works go ahead.
Map of the listed objects · 19
- Prior information request
- Under licensing
- Architecture approved
- Permit issued
- Prior communication
- Group of objects — zoom in to see them
Zoom in: up close, plots appear with their outline.
-
Building works on Rua de Santa Marinha, 1450
Architecture approved · Obras de edificação
filed: 2026
Developer: Not identified yet
-
Building works at Lugar da Voltinha
Architecture approved · Obras de edificação
filed: 2026
Developer: Not identified yet
-
Building works on Avenida António José de Almeida
Architecture approved · Obras de edificação
filed: 2026
Developer: Not identified yet
-
Building works on Rua Gonçalves de Castro
Architecture approved · Obras de edificação
filed: 2026
Developer: Not identified yet
-
Building works on Trav. Fonte dos Casados, Alheira de Baixo
Architecture approved · Obras de edificação
filed: 2026
Developer: Not identified yet
-
Building works on Caminho da Gojanda, 365
Architecture approved · Obras de edificação
filed: 2025
Developer: Not identified yet
-
Building works on Rua de Borreles
Architecture approved · Obras de edificação
filed: 2025
Developer: Not identified yet
-
Building works on Rua Alminhas de Figueiredo e Rua Caracol
Architecture approved · Obras de edificação
filed: 2025
Developer: Not identified yet
-
Building works on Rua do Regato e Rua da Fonte
Architecture approved · Obras de edificação
filed: 2025
Developer: Not identified yet
-
Building works on Travessa Fonte dos Casados
Architecture approved · Obras de edificação
filed: 2024
Developer: Not identified yet
-
Architecture approved · Obras de edificação
filed: 2024
Developer: Not identified yet
-
Building works on Rua Alto da Serra
Architecture approved · Obras de edificação
filed: 2023
Developer: Not identified yet
-
Building works on Travessa de Casaldrijo, Nº81
Architecture approved · Obras de edificação
filed: 2023
Developer: Not identified yet
-
Building works on Rua Os Panaçais
Architecture approved · Obras de edificação
filed: 2023
Developer: Not identified yet
-
Building works on Av. Dr. Moreira e Sousa - Lugar da Feiteira
Architecture approved · Obras de edificação
filed: 2023
Developer: Not identified yet
-
Building works on Rua dos Panaçais (case 327/23)
Architecture approved · Obras de edificação
filed: 2023
Developer: Not identified yet
-
Building works on Rua dos Panaçais (case 320/23)
Architecture approved · Obras de edificação
filed: 2023
Developer: Not identified yet
-
Building works on Rua dos Panaçais (case 317/23)
Architecture approved · Obras de edificação
filed: 2023
Developer: Not identified yet
-
Building works on Rua dos Panaçais (case 315/23)
Architecture approved · Obras de edificação
filed: 2023
Developer: Not identified yet
Construction barometer: the month-by-month pace
You may copy and reuse this data as long as you credit the source with a link to flatin.pt. Better still, link to this page: that way the reader can check the number. Terms of use
Talk to a professional
The consultation is given by a licensed agency, not by us. Leave your contact details and they will call to agree a time.