New construction in Canelas, Vila Nova de Gaia · 2025
What is already licensed or under licensing here. We don't yet know exactly what each project will be — we show what the municipal source says.
Data updated on
Data on building permits issued by the municipalities. Issuing a permit does not guarantee the works go ahead.
Map of the listed objects · 12
- Prior information request
- Under licensing
- Architecture approved
- Permit issued
- Prior communication
- Group of objects — zoom in to see them
Zoom in: up close, plots appear with their outline.
-
Building works on Rua Delfim de Lima - Lote 2
Architecture approved · Obras de edificação
filed: 2025
Developer: Not identified yet
-
Building works on Rua Delfim de Lima (case 82/26)
Architecture approved · Obras de edificação
filed: 2025
Developer: Not identified yet
-
Building works on Rua da Figueirinha, Nº69
Architecture approved · Obras de edificação
filed: 2025
Developer: Not identified yet
-
Building works on Rua Monte de Além, n.º 259
Architecture approved · Obras de edificação
filed: 2025
Developer: Not identified yet
-
Architecture approved · Obras de edificação
filed: 2025
Developer: Not identified yet
-
Building works on Rua Delfim de Lima (case 7408/25)
Architecture approved · Obras de edificação
filed: 2025
Developer: Not identified yet
-
Building works on Rua Norton de Matos
Architecture approved · Obras de edificação
filed: 2025
Developer: Not identified yet
-
Building works on Rua Sargento Barbosa
Under licensing · Obras de edificação
filed: 2025
Developer: Not identified yet
-
Building works on Rua Delfim de Lima (case 4594/25)
Architecture approved · Obras de edificação
filed: 2025
Developer: Not identified yet
-
Building works on Rua do Marco
Architecture approved · Obras de edificação
filed: 2025
Developer: Not identified yet
-
Building works on Rua da Liberdade
Architecture approved · Obras de edificação
filed: 2025
Developer: Not identified yet
-
Building works on Rua Padre Costa
Architecture approved · Obras de edificação
filed: 2025
Developer: Not identified yet
Construction barometer: the month-by-month pace
You may copy and reuse this data as long as you credit the source with a link to flatin.pt. Better still, link to this page: that way the reader can check the number. Terms of use
Talk to a professional
The consultation is given by a licensed agency, not by us. Leave your contact details and they will call to agree a time.